Kontaktujte nás | Jazyk: čeština English
dc.title | Parametric software effort estimation based on optimizing correction factors and multiple linear regression | en |
dc.contributor.author | Ho, Le Thi Kim Nhung | |
dc.contributor.author | Vo Van, Hai | |
dc.contributor.author | Šilhavý, Radek | |
dc.contributor.author | Prokopová, Zdenka | |
dc.contributor.author | Šilhavý, Petr | |
dc.relation.ispartof | IEEE Access | |
dc.identifier.issn | 2169-3536 Scopus Sources, Sherpa/RoMEO, JCR | |
dc.date.issued | 2021 | |
utb.relation.volume | 10 | |
dc.citation.spage | 2963 | |
dc.citation.epage | 2986 | |
dc.type | article | |
dc.language.iso | en | |
dc.publisher | Institute of Electrical and Electronics Engineers Inc. | |
dc.identifier.doi | 10.1109/ACCESS.2021.3139183 | |
dc.relation.uri | https://ieeexplore.ieee.org/document/9664538 | |
dc.subject | estimation | en |
dc.subject | software | en |
dc.subject | complexity theory | en |
dc.subject | software algorithms | en |
dc.subject | costs | en |
dc.subject | mathematical models | en |
dc.subject | analytical models | en |
dc.subject | algorithmic optimization | en |
dc.subject | multiple linear regression | en |
dc.subject | optimizing correction factors | en |
dc.subject | software development effort estimation | en |
dc.subject | use case points | en |
dc.description.abstract | Context: Effort estimation is one of the essential phases that must be accurately predicted in the early stage of software project development. Currently, solving problems that affect the estimation accuracy of Use Case Points-based methods is still a challenge to be addressed. Objective: This paper proposes a parametric software effort estimation model based on Optimizing Correction Factors and Multiple Regression Models to minimize the estimation error and the influence of unsystematic noise, which has not been considered in previous studies. The proposed method takes advantage of the Least Squared Regression models and Multiple Linear Regression models on the Use Case Points-based elements. Method: We have conducted experimental research to evaluate the estimation accuracy of the proposed method and compare it with three previous related methods, i.e., 1) the baseline estimation method – Use Case Points, 2) Optimizing Correction Factors, and 3) Algorithmic Optimization Method. Experiments were performed on datasets (Dataset D1, Dataset D2, and Dataset D3). The estimation accuracy of the methods was analysed by applying various unbiased evaluation criteria and statistical tests. Results: The results proved that the proposed method outperformed the other methods in improving estimation accuracy. Statistically, the results proved to be significantly superior to the three compared methods based on all tested datasets. Conclusion: Based on our obtained results, the proposed method has a high estimation capability and is considered a helpful method for project managers during the estimation phase. The correction factors are considered in the estimation process. Author | en |
utb.faculty | Faculty of Applied Informatics | |
dc.identifier.uri | http://hdl.handle.net/10563/1010783 | |
utb.identifier.obdid | 43882978 | |
utb.identifier.scopus | 2-s2.0-85122291307 | |
utb.identifier.wok | 000741990600001 | |
utb.source | j-scopus | |
dc.date.accessioned | 2022-01-17T09:54:17Z | |
dc.date.available | 2022-01-17T09:54:17Z | |
dc.description.sponsorship | Faculty of Applied Informatics, Tomas Bata University in Zlin [IGA/CebiaTech/2021/001, RO30216002025] | |
dc.rights | Attribution 4.0 International | |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | |
dc.rights.access | openAccess | |
utb.contributor.internalauthor | Ho, Le Thi Kim Nhung | |
utb.contributor.internalauthor | Vo Van, Hai | |
utb.contributor.internalauthor | Šilhavý, Radek | |
utb.contributor.internalauthor | Prokopová, Zdenka | |
utb.contributor.internalauthor | Šilhavý, Petr | |
utb.fulltext.affiliation | HO LE THI KIM NHUNG , VO VAN HAI , RADEK SILHAVY , ZDENKA PROKOPOVA , AND PETR SILHAVY Faculty of Applied Informatics, Tomas Bata University in Zlin, 755 01 Zlin, Czech Republic Corresponding author: Petr Silhavy ([email protected]) | |
utb.fulltext.dates | Received October 27, 2021 accepted December 24, 2021 date of publication December 28, 2021, date of current version January 10, 2022 | |
utb.fulltext.sponsorship | This work was supported by the Faculty of Applied Informatics, Tomas Bata University in Zlin, under Project IGA/CebiaTech/2021/001 and Project RO30216002025. | |
utb.wos.affiliation | [Ho Le Thi Kim Nhung; Vo Van Hai; Silhavy, Radek; Prokopova, Zdenka; Silhavy, Petr] Tomas Bata Univ Zlin, Fac Appl Informat, Zlin 75501, Czech Republic | |
utb.scopus.affiliation | Faculty of Applied Informatics, Tomas Bata University in Zlin, 75501 Zlin, Czech Republic. (e-mail: [email protected]); Faculty of Applied Informatics, Tomas Bata University in Zlin, 75501 Zlin, Czech Republic. | |
utb.fulltext.projects | IGA/CebiaTech/2021/001 | |
utb.fulltext.projects | RO30216002025 | |
utb.fulltext.faculty | Faculty of Applied Informatics | |
utb.fulltext.ou | - |