Contact Us | Language: čeština English
Title: | Proposal for the flow of material and adjustments to the storage system of an external service provider | ||||||||||
Author: | Strohmandl, Jan; Kalupová, Blanka; Rejzková, Kateřina; Tomek, Miroslav | ||||||||||
Document type: | Peer-reviewed article (English) | ||||||||||
Source document: | Open Engineering. 2021, vol. 11, issue 1, p. 948-955 | ||||||||||
ISSN: | 2391-5439 (Sherpa/RoMEO, JCR) | ||||||||||
Journal Impact
This chart shows the development of journal-level impact metrics in time
|
|||||||||||
DOI: | https://doi.org/10.1515/eng-2021-0098 | ||||||||||
Abstract: | This article deals with issues related to the flow of material to the assembly line and examines the possibilities of reducing the costs of this process. It is based on the current state of the transport of individual parts to the producing company and the storage system using Kanban and Just in Sequence (JIS) logistics technologies, and the subsequent collection of material for transport to the assembly line. The change in the system of transport technology has led to a reduction of the total storage space and costs, and at the same time, the processes related to storage and collection of parts have been simplified. The whole process of material flow to the assembly line is solved using the real supply system via the JIS technology, together with the system of receipt and storage of components in connection with individual operations during the handling and storage of these components, and their picking and transport to the assembly line. Evidently, the change in the system and the associated savings can also be employed to warehouses and manufacturing companies of the automotive industry, which use automated assembly lines with the timing of the assembly process of the final product. | ||||||||||
Full text: | https://www.degruyter.com/document/doi/10.1515/eng-2021-0098/html | ||||||||||
Show full item record |